Euston railway station ( ; or London Euston) is a major central London railway terminus and connected London Underground station managed by Network Rail in the London Borough of Camden. It is the southern terminus of the West Coast Main Line, the UK's busiest inter-city railway. Euston is the tenth-busiest station in Britain and the country's busiest inter-city passenger terminal, being the gateway from London to the West Midlands, North West England, North Wales and Scotland.
Intercity express passenger services to the major cities of Birmingham, Manchester, Liverpool, Glasgow and Edinburgh, and through services to for connecting ferries to Dublin are operated by Avanti West Coast. Overnight sleeper services to Scotland are provided by the Caledonian Sleeper. London Northwestern Railway provide commuter and regional services to the West Midlands, whilst the Lioness line of the London Overground provides local suburban services in the London area via the Watford DC Line which runs parallel to the West Coast Main Line as far as . Euston tube station is connected to the main concourse and Euston Square tube station is nearby. King's Cross and St Pancras railway stations are about east along Euston Road.
Euston, the first inter-city railway terminal in London, was planned by George and Robert Stephenson. It was designed by Philip Hardwick and built by William Cubitt, with a distinctive Euston Arch over the station entrance. The station opened as the terminus of the London and Birmingham Railway (L&BR) on 20 July 1837. Euston was expanded after the L&BR was amalgamated with other companies to form the London and North Western Railway, and the original sheds were replaced by the Great Hall in 1849. Capacity was increased throughout the 19th century from two platforms to fifteen. The station was controversially rebuilt in the mid-1960s when the Arch and the Great Hall were demolished to accommodate the electrified West Coast Main Line, and the revamped station still attracts criticism over its architecture. Euston is to be the London terminus for the planned High Speed 2 railway and the station is being redeveloped to accommodate it.
The site was chosen in 1831 by George and Robert Stephenson, engineers of the L&BR. The area was mostly farmland at the edge of the expanding city, and adjacent to the New Road (now Euston Road), which had caused urban development. The name Euston came from Euston Hall, the seat of the duke of Grafton, who owned the locality.
The station and railway have been owned by the L&BR (1837–1846), the London and North Western Railway (LNWR) (1846–1923), the London, Midland and Scottish Railway (LMS) (1923–1948), British Railways (1948–1994), Railtrack (1994–2002) and Network Rail (2002–present).
Initial services were three trains to and from with journeys taking just over an hour. On 9 April 1838, they were extended to a temporary halt at near Bletchley where a coach service was provided to . The line to Curzon Street station in Birmingham opened on 17 September 1838, the journey of took around hours.
The incline from Camden Town to Euston involved crossing the Regent's Canal on a gradient of more than 1 in 68 (1.47%). Because steam trains at the time could not climb such an ascent, they were cable-hauled on the down line towards Camden until 1844, after which bank engines were used. The L&BR's act of Parliament prohibited the use of locomotives in the Euston area, following concerns of residents about noise and smoke from locomotives toiling up the incline.
The station was built with space left vacant for extra platforms, as it was originally planned for the Great Western Railway (GWR) to use Euston, as the terminus of the Great Western Main Line. In the event, the GWR chose to build their own terminus at Paddington. The spare land was instead used for more platforms for ever expanding services as the railway network grew.
The station building, designed by the classically trained architect Philip Hardwick, had a trainshed by structural engineer Charles Fox. It had two platforms, one each for departures and arrival. The main entrance portico, the Euston Arch, also by Hardwick, symbolised the arrival of a major new transport system and was "the gateway to the north". It was high, supported on four by hollow Doric order Propylaea columns of Bramley Fall stone, the largest ever built. It was completed in May 1838 and cost £35,000 (now £). The old station building was probably the first one in the world with all-wrought iron roof trusses.
The first railway hotels in London were built at Euston. Two hotels designed by Hardwick opened in 1839 on either side of the Arch; the Victoria on the west had basic facilities while the Euston on the east was designed for first-class passengers.
Between 1838 and 1841, parcel handling grew from 2,700 parcels a month to 52,000. By 1845, 140 staff were employed but trains began to run late because of a lack of capacity. The following year, two platforms (later 9 and 10) were constructed on vacant land to the west of the station that had been reserved for Great Western Railway services. The L&BR amalgamated with the Manchester & Birmingham Railway and the Grand Junction Railway in 1846 to form the LNWR. The company headquarters were established at Euston requiring a block of offices to be built between the Arch and the platforms.
The station's facilities were expanded with the opening of the Great Hall on 27 May 1849 replacing the original sheds. The Great Hall was designed by Hardwick's son Philip Charles Hardwick in classical style. It was long, wide, and high with a ceiling and a sweeping double flight of stairs leading to offices at its northern end. Architectural sculptor John Thomas contributed eight allegorical statues representing the cities served by the line. The station faced Drummond Street, further back from Euston Road than the front of the modern complex; Drummond Street now terminates at the side of the station but then ran across its front. www.motco.com – 1862 map, showing position of 1849 station. A short road, Euston Grove, ran from Euston Square towards the arch.
A bay platform (later platform 7) for local services to Kensington (Addison Road) opened in 1863. Two new platforms (1 and 2) were added in 1873 along with an entrance for cabs from Seymour Street. At the same time, the station roof was raised by to accommodate smoke from the engines.
The continued growth of long-distance railway traffic led to major expansion along the station's west side starting in 1887. It involved rerouting Cardington Street over part of the burial ground (later St James's Gardens)Location of St James's burial ground of St James's Church, Piccadilly, which was located some way from the church. To avoid public outcry, the remains were reinterred at St Pancras Cemetery. Two more platforms (4 and 5) opened in 1891. Four departure platforms (now platforms 12–15), bringing the total to 15, and a booking office on Drummond Street opened on 1 July 1892.
The line between Euston and Camden was doubled between 1901 and 1906. A new booking hall opened in 1914 on part of the cab yard. The Great Hall was redecorated and refurbished between 1915 and 1916 and again in 1927. The station's ownership was transferred to the London, Midland and Scottish Railway (LMS) in the 1923 grouping.
Apart from the lodges on Euston Road and statues now on the forecourt, few relics of the old station survive. The National Railway Museum's collection at York includes Edward Hodges Baily's statue of George Stephenson from the Great Hall; the entrance gates; and a turntable from 1846 discovered during demolition.
In 1937 it appointed the architect Percy Thomas to produce designs. He proposed an American-inspired station that would involve removing or resiting the arch, and included office frontages along Euston Road and a helicopter pad on the roof. Redevelopment began on 12 July 1938, when of limestone was extracted for the building and new flats were constructed to rehouse people displaced by the works. The project was shelved indefinitely because of World War II.
The station was damaged several times during the Blitz in 1940. Part of the Great Hall's roof was destroyed, and a bomb landed between platforms 2 and 3, destroying offices and part of the hotel.
British Railways announced that Euston would be rebuilt to accommodate the electrification of the West Coast Main Line in 1959. Because of the restricted layout of track and tunnels at the northern end, enlargement only could be accomplished by expanding southwards over the area occupied by the Great Hall and the Arch. The New Euston Station 1968. British Rail information booklet. Permission to demolish the Arch and Great Hall was sought from London County Council and it was granted on condition that the Arch would be restored and re-sited. BR estimated it would cost at least £190,000 (now £) and was not viable.
The Arch's demolition, announced by the Minister of Transport, Ernest Marples in July 1961, drew objections from the Earl of Euston, the Earl of Rosse and John Betjeman. Experts did not believe the work would cost £190,000 and speculated it could be done more cheaply by foreign labour. On 16 October 1961, 75 architects and students staged a demonstration against its demolition inside the Great Hall and a week later Sir Charles Wheeler led a deputation to speak with the Prime Minister Harold Macmillan. Macmillan replied that as well as the cost, there was nowhere large enough to relocate the Arch in keeping with its surroundings.
Demolition began on 6 November and was completed within four months. The station was rebuilt by Taylor Woodrow Construction to a design by London Midland Region architects of British Railways, William Robert Headley and Ray Moorcroft, in consultation with Richard Seifert. Redevelopment began in summer 1962 and progressed from east to west, the Great Hall was demolished and an temporary building housed ticket offices and essential facilities. Euston worked to 80% capacity during the works with at least 11 platforms in operation at any time. Services were diverted elsewhere where practical and the station remained operational throughout the works.
The first phase of construction involved building 18 platforms with two track bays to handle parcels above them, a signal and communications building and various staff offices. The parcel deck was reinforced using 5,500 tons of structural steelwork. Signalling on the routes leading out of the station was reworked along with the electrification of the lines, including the British Rail Automatic Warning System. Fifteen platforms had been completed by 1966, and the electric service began on 3 January. An automated parcel depot above platforms 3 to 18 opened on 7 August 1966. The station was opened by Elizabeth II on 14 October 1968.
The station is a long, low structure, wide and deep under a high roof. It opened with integrated automatic ticket facilities and a range of shops; the first of its kind for any British station. The plan to construct offices above the station whose rents would help fund the cost of the rebuilding was scrapped after a government White Paper was released in 1963 that restricted the rate of commercial office development in London.
In 1966, a "Whites only" recruitment policy for guards at the station was dropped after the case of Asquith Xavier, a migrant from Dominica, who had been refused promotion on those grounds, was raised in Parliament and taken up by the Secretary of State for Transport, Barbara Castle.
A second development phase by Richard Seifert & Partners began in 1979, adding of office space along the station frontage in the form of three low-rise towers overlooking Melton Street and Eversholt Street. The offices were occupied by British Rail, then by Railtrack, and by Network Rail which has now vacated all but a small portion of one of the towers. The offices are in a functional style; the main facing material is polished dark stone, complemented by white tiles, exposed concrete and plain glazing.
The station has a large concourse separate from the train shed. Originally, no seats were installed there to deter vagrants and crime, but were added after complaints from passengers. Few remnants of the older station remain: two Portland stone entrance lodges, the London and North Western Railway War Memorial and a statue of Robert Stephenson by Carlo Marochetti, from the old ticket hall, stands in the forecourt.
A large statue by Eduardo Paolozzi named Piscator dedicated to German theatre director Erwin Piscator is sited at the front of the courtyard, which as of 2016 was reported to be deteriorating. Other pieces of public art, including low stone benches by Paul de Monchaux around the courtyard, were commissioned by Network Rail in 1990. The station has catering units and shops, a large ticket hall and an enclosed car park with over 200 spaces. The lack of daylight on the platforms compares unfavourably with the glazed trainshed roofs of traditional Victorian railway stations, but the use of the space above as a parcels depot released the maximum space at ground level for platforms and passenger facilities.
Since 1996, proposals have been formulated to reconstruct the Arch as part of the redevelopment of the station, and its use as the terminus of the High Speed 2 line.
In 2007, British Land announced that it had won the tender to demolish and rebuild the station, spending some £250 million of its overall redevelopment budget of £1 billion for the area. The number of platforms would increase from 18 to 21. In 2008, it was reported that the Arch could be rebuilt. In September 2011, the demolition plans were cancelled, and Aedas was appointed to give the station a makeover.
In July 2014 a statue of navigator and cartographer Matthew Flinders, who circumnavigated the globe and charted Australia, was unveiled at Euston; his grave was rumoured to lie under platform 15 at the station, but had been relocated during the original station construction and in 2019 was found behind the station during excavation work for the HS2 line.
The station is to have seven new platforms dropped from an original planned eight, taking the total to 23, with 10 dedicated to HS2 services and 13 to conventional lines at a low level. The flats demolished for the extension would be replaced by significant building work above. The Underground station would be rebuilt and connected to adjacent Euston Square station. As part of the extension beyond Birmingham, the Mayor of London's office believed it will be necessary to build the proposed Crossrail 2 line via Euston to relieve 10,000 extra passengers forecast to arrive during an average day.
To relieve pressure on Euston during and after rebuilding for High Speed 2, HS2 Ltd has proposed the diversion of some services to (for Crossrail). This would include eight commuter trains per hour originating/terminating between and inclusive. In 2016, the Mayor Sadiq Khan endorsed the plans and suggested that all services should terminate at Old Oak Common while a more appropriate solution is found for Euston.
The current scheme does not provide any direct access between High Speed 2 at Euston and the existing High Speed 1 at St Pancras. In 2015, plans were announced to link the two stations via a travelator service. Platforms 17 and 18 closed in May and June 2019 for High Speed 2 preparation work.
The Euston Downside Carriage Maintenance Depot was demolished in 2018 in preparation for the start of tunnelling. The two office towers in front of the station were demolished between January 2019 and December 2020. The third tower at 1 Eversholt Street is not part of these plans. Two hotels on Cardington Street adjacent to the west of the station were also demolished. The cemetery in adjacent St James's Gardens was also controversially excavated in 2018–19, resulting in an estimated 60,000 graves having to be exhumed, and the entire site being cleared of all human remains the largest exhumation in British history, and the corpses having to be reburied in Brookwood Cemetery in Brookwood, Surrey.
In August 2019, the Department for Transport (DfT) ordered an independent review of the project, chaired by the British civil engineer Douglas Oakervee. The Oakervee Review was published by the Department for Transport the following February, alongside a statement from the Prime Minister Boris Johnson confirming that HS2 would go ahead in full, with reservations. The review said the rebuild was "not satisfactory" and called the management "muddled" and recommended a change of governance. In Summer 2020, the government asked Network Rail's chairman, Sir Peter Hendy, to lead an oversight board; in October 2020, the Architects' Journal reported that more than £100m had already been spent on engineering and architectural design fees.
In October 2023, the Prime Minister Rishi Sunak announced that construction of the Euston terminus and approach tunnel would not be government funded and that it could only go ahead with private sector investment. Transport for London commissioner Andy Lord was sceptical that the private sector would pay for the link to Old Oak Common. Government funding for the approach tunnel was subsequently restored in the October 2024 United Kingdom budget; the source of funding for the station itself remained unconfirmed.
Access to parts of the station is difficult for people with physical disability. The introduction of lifts in 2010 made the taxi rank and underground station accessible from the concourse, though some customers found them unreliable and frequently broken down. Wayfindr technology was introduced to the station in 2015 to help people with visual impairment to navigate the station.
In September 2023, the Office of Rail and Road issued Network Rail with an improvement notice in relation to its failure to put in place effective measures to tackle overcrowding. Network Rail admitted that the station was designed for a different era and that "the passenger experience at Euston remains uncomfortable at times". The Office of Rail and Road declared in December 2023 that Network Rail had complied with the notice and implemented measures to better manage passenger traffic flows and overcrowding. In October 2024, London TravelWatch warned that passengers at Euston are being put in danger when the station becomes severely overcrowded during periods of disruption to services. Transport Secretary Louise Haigh subsequently asked Network Rail to declutter the station concourse and improve how it handles train announcements. Network Rail reacted by switching off the advertising board installed in January 2024 after removal of the main departure boards, and issued a five point improvement plan.
On 27 August 1928, a passenger train collided with the buffer stops. Thirty people were injured.
On 10 November 1938, a suburban service collided with empty coaches after a signal was misinterpreted. 23 people were injured.
On 6 August 1949, an empty train was accidentally routed towards a service for Manchester, colliding with it at about . The crash was blamed on a lack of and no proper indication of when platforms were occupied.
Avanti West Coast operates InterCity West Coast services:
London Northwestern Railway operates regional and commuter services.
London Overground operates local commuter services.
Caledonian Sleeper operates two nightly services to Scotland from Sunday to Friday inclusive.
Great Western Railway will operate InterCity Greater Western services on occasional days from .
Night Riviera will operate a nightly service to Cornwall from Sunday to Friday inclusive, on occasional days from .
The underground network around Euston is planned to change depending on the construction of High Speed 2. Transport for London (TfL) plans to change the safeguarded route for the proposed Chelsea–Hackney line to include Euston between Tottenham Court Road and King's Cross St Pancras. As part of the rebuilding work for High Speed 2, it is proposed to integrate Euston and Euston Square into a single tube station.
|
|